SAILENT FEATURES

  • APGENCO was bifurcated into APGENCO (Residuary) and Telangana Generation Corporation Limited (TSGENCO) as per AP Reorganization Act, 2014 w.e.f 02.06.2014.
  • Thermal Installed Capacity: 2810 MW
  • Hydel Installed Capacity: 1797.60 MW
  • Solar Installed Capacity: 5.426 MW
  • Total Installed Capacity: 4613 MW
  • APGENCO has achieved annual generation of 20708.8 MU during 2016-17.
  • Thermal power stations (Dr. NTTPS & RTPP) have achieved annual generation of 18366.7 MU during 2016-17.
  • Thermal power stations (Dr. NTTPS & RTPP) have achieved 74.61% PLF during 2016-17.
  • Generation from Hydro power stations is 2339.1 MU during 2016-17.
  • Overhaul of 10 Thermal Units (2100 MW) got completed during 2016-17. Loss of generation due to overhauls is about 1014 MU.
  • About 3480 MU was backed down at thermal stations as per the instructions of Load Dispatch Centre during 2016-17.
  • Thermal power stations have recorded the highest daily generation of 65.73 MU on 05.04.2016 during 2016-17.
  • Hydel stations have recorded the highest daily generation of 23.64 MU on 26.09.2016 during 2016-17.
  • Solar generation has recorded highest daily generation of 0.031 MU on 03.03.2017.
  • APGENCO has recorded the highest daily generation of 79.13 MU on 22.08.2016.
  • Dr NTTPS has achieved 75.6% PLF and Rayalaseema TPS achieved 73.0% PLF.
  • Thermal stations have achieved 88.8% deemed PLF (Dr NTTPS - 86.3% & RTPP - 92.8%).